Return
	
	
		
			
				
			
				
			
				
				
					
		
		
			
	
	
	
			Client:
Mopani Copper MinesLocation:
Kitwe, ZambiaScope of Work:
						
						Shaft Sinking
					
					
						
						Raiseboring
					
			Product:
Redbore 100The Synclinorium project consisted of directional drilling and reaming of a 6.1 m x 1,180 m shaft with the Redbore 100 raise drill.
The shaft was bored in two sections, 700 m and 480 m in length respectively.
;| 
 
  | 
 
 COMPLETED WITH REDBORE 100 LARGEST PROVEN CAPACITY   | 
 
  | 
	

