Return
Client:
Mopani Copper MinesLocation:
Kitwe, ZambiaScope of Work:
Shaft Sinking
Raiseboring
Product:
Redbore 100The Synclinorium project consisted of directional drilling and reaming of a 6.1 m x 1,180 m shaft with the Redbore 100 raise drill.
The shaft was bored in two sections, 700 m and 480 m in length respectively.
;
|
COMPLETED WITH REDBORE 100 LARGEST PROVEN CAPACITY |
|