Client :
BHPLieu :
South Australia, AustralieDurée :
9 ans (Commencé 2015)Protée des travaux :
The BHP Olympic Dam Mine is located in South Australia, 560 km north of Adelaide. It is one of the world's largest deposits of copper, gold and uranium and also has a significant deposit of silver.
Redpath has provided underground contract services at Olympic Dam for more than eight years, with work still ongoing. Redpath is currently providing ground support and hand-held rehabilitation services at the site. This specialized work includes the installation of ground support systems such as cable bolting, fibre-crete application, and hand-held bolting. To enhance safety and environmental sustainability, Redpath employs a growing fleet of hybrid concrete agitator trucks and electric Spraymec machines. These vehicles improve safety and reduce environmental impact, while enhancing operational outcomes for the mine.
Redpath has also completed various stages of lateral development and ground support using drill-and blast techniques, following the initial portal construction and decline development carried out by Redpath.
;|
UNDERGROUND |
LARGE DIAMETER |
PROVIDING |
Voir plus de nos projets
/Olympic Dam-Underground Development Services.jpg)
/Olympic Dam-Large Diameter Raiseboring.jpg)
/Olympic Dam-Providing Complete Range.jpg)